Solomon Data Systems develops right sized AI data center campuses across America: 20 to 400 MW sites with secured power, behind the meter generation, and a supply chain that delivers in months, not years.
Figures as of June 2026. MW figures are critical IT capacity in active development; lease capacity in commercial closing is subject to definitive agreements; pipeline figures indicative. † Delivery timeline for grid powered campuses of this class, where site and interconnection conditions allow.
Right sized moves faster. Three campuses in active development, with 240 MW in commercial lease closing, built to energize quickly and scale with their tenants.
Existing powered building with expansion land and fiber rich connectivity. The fastest path to energized capacity in the portfolio.
Anchor behind the meter campus: a private utility network built on turbine, reciprocating engine, and BESS with primary firm gas transport and LNG backup. Power that never waits in a queue.
Compact campus with deep expansion headroom, a direct repeat of the Project Sky playbook, sized to energize fast and scale with the tenant.
For grid powered campuses of this class, where site and interconnection conditions allow. Long lead equipment managed from day one; design, permitting, and procurement run in parallel.
Data center capacity fails for predictable reasons: power that never arrives, land that never permits, equipment that never ships, communities that never consent. We secure all four before the lease is signed.
Grid interconnection where it works, private utility networks behind the meter where it doesn't. Our capital builds the substations, feeders, and protection upgrades. Utilities and their members never subsidize our load.
Controlled, entitled land ready for dense AI loads, qualified by our proprietary siting and diligence technology before we ask for a tenant's time.
Generation equipment on 8 month lead times against industry quotes of 24 to 36; high voltage transformers and breakers in 6 to 12. The supply chain is the schedule.
We covenant what others talk about: we sign binding commitments on water, light, sound, and emissions with host counties.
Full campuses engineered for single anchor tenants running dense AI workloads, not retail colocation retrofitted for the moment.
Liquid cooled, DC power ready designs that deliver 300 kW+ per rack now, for the inference and training fleets actually shipping, not the ones being announced.
Heat rejection without water, tuned to a 1.1 to 1.2 annualized PUE target: less energy overhead, less strain on the grid, for the same compute output.
Harmonic management, supercapacitor support, and blended peaking plus baseload generation. Power quality engineered into the campus, not bolted on.
Powered campuses in Georgia, Texas, and Ohio, with a 1.5 GW pipeline behind them, delivered on timelines the grid alone can't offer.
Real demand, institutional capital relationships, and covenants in writing, before we request a single study.
AI inference silicon, network fabric, long lead electrical, plus colocation and GPU capacity through the platform.
Every Solomon campus starts where most projects stall: secured energy. Tell us what you need to deploy, and we'll show you how fast we can stand it up.