Rapid, Right-Sized AI Data Centers

COMPUTE,SECURED.

Solomon Data Systems develops right-sized AI data center campuses across America — 20 to 400 MW sites with secured power, behind-the-meter generation, and a supply chain that delivers in months, not years.

860 MW
Critical IT in development
240 MW
In commercial lease closing
1.5 GW
Captive + JV pipeline
~9 MO
Substation + data center delivery †

Figures as of June 2026. MW figures are critical IT capacity in active development; lease capacity in commercial closing is subject to definitive agreements; pipeline figures indicative. † Delivery timeline for grid-powered campuses of this class, where site and interconnection conditions allow.

01 / IN DEVELOPMENT NOW

The first three campuses

Right-sized moves faster. Our first three campuses — with 240 MW in commercial lease closing, backed by investment-grade credit support — are built to energize quickly, prove the model, and repeat it.

Georgia · Grid-Powered
40 MW
PROJECT SKY · GEORGIA

Existing powered building with expansion land and fiber-rich connectivity. The fastest path to energized capacity in the portfolio.

Power
Grid · substation upgrade underway
Status
Active development · Jun 2026
Texas · Behind-the-Meter
400 MW
PROJECT OMEGA · TEXAS

Anchor behind-the-meter campus: a turbine, reciprocating-engine, and BESS microgrid with primary firm gas transport and LNG backup — power that never waits in a queue.

Power
BTM microgrid · grid optionality
Status
Active development · Jun 2026
Ohio · Grid-Powered
20 MW
PROJECT EAGLE RIDGE · OHIO

Compact campus with deep expansion headroom — a direct repeat of the Project Sky playbook, sized to energize fast and scale with the tenant.

Power
Grid · expansion headroom
Status
Active development · Jun 2026
Delivery speed
Substation + data center in as little as ~9 months

For grid-powered campuses of this class, where site and interconnection conditions allow. Long-lead equipment managed from day one; design, permitting, and procurement run in parallel.

02 / THE MODEL

Four things, secured

Data center capacity fails for predictable reasons: power that never arrives, land that never permits, equipment that never ships, communities that never consent. We secure all four before the first rack arrives.

Power, secured

Grid interconnection where it works, behind-the-meter microgrids where it doesn't. Once the tenant signs, our capital builds the substations, feeders, and protection upgrades — utilities and their members never subsidize our load.

Sites, secured

Controlled, entitled land ready for dense AI loads — qualified by our proprietary siting and diligence technology before we ask for a tenant's time.

Supply, secured

Generation equipment on 8-month lead times against industry quotes of 24–36; high voltage transformers and breakers in 6–12. The supply chain is the schedule.

Community, secured

We covenant what others talk about: we sign binding commitments on water, light, sound, and emissions with host counties and serving utilities.

03 / ENGINEERING

Built for the AI era

Full campuses engineered for single anchor tenants running dense AI workloads — not retail colocation retrofitted for the moment.

Density

300 kW+ racks, today

Liquid-cooled, DC-power-ready designs that deliver 300 kW+ per rack now — for the inference and training fleets actually shipping, not the ones being announced.

Efficiency

1.1–1.2 design PUE ¹

Water-free heat rejection tuned to a 1.1–1.2 annualized PUE target — less energy overhead, less strain on the grid, for the same compute output.

Power quality

Grid-grade power engineering

Harmonic management, supercapacitor support, and blended peaking-plus-baseload generation — power quality engineered into the campus, not bolted on.

¹ Annualized design target; final figures are site- and climate-specific.
04 / WHO WE WORK WITH

Three conversations we're ready for

AI & Cloud

Need megawatts on a real schedule?

Powered campuses in Georgia, Texas, and Ohio — with a 1.5 GW pipeline behind them — delivered on timelines the grid alone can't offer.

Discuss capacity

Utilities & Cooperatives

A developer that shows up with proof

Real demand, institutional capital relationships, and covenants in writing — before we request a single study.

Our commitments

Hardware & Capacity

Compute, equipment, and space

AI inference silicon, network fabric, long-lead electrical, plus colocation and GPU capacity through the platform.

Supply chain

The power is the product.

Every Solomon campus starts where most projects stall: secured energy. Tell us what you need to deploy, and we'll show you how fast we can stand it up.

Start the conversation