We built a secured global supply chain to keep our own campuses on time. The same channels serve operators who need generation equipment, compute hardware, and network fabric — without the wait.
Figures as of June 2026. Lead times reflect current secured allocations and channel capacity; subject to configuration and order timing.
Turbines, reciprocating engines, and BESS on secured allocations of up to 500 MW per month — 8-month lead times against industry quotes of 24–36, with 50 MW deliverable in 120 days on spot.
Power transformers and breakers on 6–12 month lead times through our channels — the components everyone else waits years for.
Purpose-built AI inference ASICs and accelerator systems, sourced through direct relationships with leading silicon and networking innovators.
50+ MW of colocation capacity and GPU compute access available through the platform — for teams that need deployed capacity, not a construction schedule.
We procure against real projects with real schedules — which means relationships, allocations, and pricing that paper intermediaries don't get. Equipment allocation is a scarce asset; we treat it like one.
We procure against our own campus schedules. Counterparties treat us as the principal buyer we are.
Every sourcing engagement is run by the same team that holds our campus delivery dates — logistics, commissioning context, and integration included.
Tell us the workload and the timeline. We respond with sourcing options, current lead-time reality, and a deliverable plan.
Generation, electrical, compute, or megawatts of colocation — start with what you're deploying and when.
Request current lead times